Duck River Bridge, M4 Motorway, Auburn, NSW
Reinforced Concrete Box Girder Bridge
Our Client: Fulton Hogan
Scope
Provision of design for the bearings replacement and additional lateral restraint Plinth. Replacement with free sliding bearings allows existing fixings to be used, Design for a Lateral restraint system built externally on the side of the abutment